Gutting a house down to the studs in the Minneapolis metro typically costs $15,000 to $35,000 for the demolition portion alone on an average single-family home, separate from the remodel that follows. The exact number depends on square footage, whether you are removing to the studs or further, and how much of the home has hazardous materials that require abatement.
By Precision Demolition, a licensed and insured demolition contractor serving Minneapolis, St. Paul, and the Twin Cities metro. Our crews are in-house, EPA Lead-Safe Certified, and OSHA 10-trained, and every gut project is handed back clean and broom-swept, ready for the next trade.
Search for house gut cost, and most of what you find is remodel pricing wearing a demolition label. National sites and remodeling companies quote the full project, demolition plus rebuild, as one number, which is why the figures online swing so wildly and why Twin Cities homeowners and investors keep asking what the gut itself actually costs. This guide isolates the demolition line item: what a professional full house gut costs in Minneapolis and St. Paul, what drives that number up or down, and what you should budget for separately.
These two numbers get confused constantly, and they are not the same purchase.
The gut cost is the demolition portion only. It pays for a trained crew to take the interior of the house apart: drywall and plaster, flooring, cabinetry, bathroom finishes, fixtures, and interior trim, removed down to the studs and subfloor, loaded out, hauled away, and disposed of. When the gut is finished, you own an empty, clean structure. Nothing has been rebuilt yet.
Remodel cost is everything after that. Framing changes, electrical, plumbing, HVAC, insulation, drywall, flooring, cabinets, tile, paint, and finishes. On a full renovation, the remodel portion is several times the size of the gut portion, and it is where most of the figures quoted online actually live. When a website tells you a gut remodel costs a large per-square-foot figure, nearly all of that figure is rebuild work, trades, and materials, not demolition.
Why does the separation matter? Because the gut is the first line item chronologically and the one everything else schedules around. A general contractor building a realistic project budget prices the demolition phase on its own, the way it is broken out in our full demolition cost guide. Investors running numbers on a flip or a rehab need the same separation, because a wrong gut figure distorts the whole deal.
For the demolition portion alone, an average single-family home in the Minneapolis-St. Paul metro typically runs $15,000 to $35,000. That range covers a complete interior gut to the studs: every room, every finish, taken back to bare framing and subfloor, with debris hauled and disposed of.
Two things about that range are worth understanding before you use it.
First, a whole-house gut is not quoted off a simple per-square-foot rate. Single-room interior demolition can be estimated per square foot, because the scope is one space with a defined set of finishes. A full house gut is dozens of scopes stacked together: plaster in one room and drywall in another, tile bathrooms, a finished basement, insulation, multiple flooring types, and far more disposal volume than any single room produces. Depth of scope matters as much as area. Removing finishes to the studs is one job; also taking ceilings, subfloor, or specific structural elements is a bigger one. For that reason, whole-house pricing is quoted per project, after a walkthrough, not from a rate card. A firm whole-house number given without a walkthrough is a guess.
Second, age changes everything in the Twin Cities. Minneapolis and St. Paul housing stock includes a large share of older homes with plaster and lath, layered flooring, and, in homes built before 1980, the real possibility of asbestos and lead paint. Those materials slow the work down and can require abatement before or during demolition, which is why two houses of identical square footage on the same street can land far apart in the range.
The most reliable way to price a gut is to have a contractor scope it in person, room by room, and quote it in writing. That is how a Minneapolis house gut contractor should be pricing your project, and it is the number you can safely build a remodel budget on top of.
Four factors explain most of the spread between the low and high ends of the range, and every one of them is visible on a walkthrough.
Square footage and layout. Size is the starting point. More interior area means more material to remove, more labor hours, and more debris. Layout compounds it: a two-story home with a finished basement and an attic conversion holds far more demolishable interior than a single-story home of the same footprint.
What the house is made of. Plaster and lath, common in older Minneapolis and St. Paul homes, is heavier and slower to take down than modern drywall. Tile set in mortar beds, stone, real hardwood under layers of later flooring, and cast iron tubs all add labor and weight. A house finished in drywall and carpet guts faster and cheaper than one finished in plaster, tile, and hardwood.
Hazardous materials. If testing finds asbestos or lead paint, the affected materials need regulated handling, and abatement can become its own line item before general demolition proceeds. Precision Demolition is an EPA Lead-Safe Certified firm, so lead-regulated work is handled correctly in-house, but the scope and the cost still belong in the quote, not in a surprise change order. The Minnesota Pollution Control Agency asbestos guidance sets out how asbestos is regulated in Minnesota before renovation and demolition work.
Access and disposal. Everything removed has to leave the house and the property. Tight lots, narrow stairwells, upper-floor work, and limited space for a roll-off dumpster all slow the load-out. Disposal is a major cost driver: a full gut uses serious dumpster capacity, and heavy materials like plaster, tile, and masonry cost more to haul and dispose of than lightweight drywall. When you compare bids, confirm that hauling and disposal are inside the quoted number.
Structural elements sit across all four factors. If the remodel plan removes or moves a structural wall, the demolition crew coordinates the sequence with your general contractor, and the framing work that supports or rebuilds that wall is a separate trade scope, priced by the framing side, not buried in the gut price.
Size is the easiest planning lever, so use the table below to place your project in the range. These are planning positions anchored to the $15,000 to $35,000 range for an average single-family home, not quotes. Finishes, age, and hazardous materials move a specific house within, or beyond, its row.
Home size | Where it typically lands |
|---|---|
1,000 sq ft | Low end of the range or below it. Less interior to remove and less disposal volume, so a lighter scope in a newer home sits at the bottom of the pricing picture. |
1,500 sq ft | The middle of the $15,000 to $35,000 range. This is close to the average single-family scope the range was built on, with typical finishes and no major abatement. |
2,000+ sq ft | Upper end of the range, and larger or heavier homes can go above $35,000, especially with plaster, multiple bathrooms, a finished basement, or abatement in scope. |
A 1,200 sq ft house, a size homeowners ask about often, sits between the first two rows: smaller than the average home behind the range, so most 1,200 sq ft guts price toward the lower portion of it when the scope is light and no regulated materials are involved.
However, your home lands in the table, treat the figure as a budget anchor for the demolition phase, then replace it with a written, per-project quote before you commit to a remodel budget or a closing date.
A professional full house gut from a licensed contractor should include the complete removal scope, executed in one sequenced pass:
Budget these items separately, because they are not part of the demolition line item:
This separation is also why in-house crews protect your number. Precision Demolition runs gut projects with its own employees and no subcontractors, so the crew on site is working from the scope you signed.
A full interior gut typically takes 2 to 4 weeks from mobilization to handoff, depending on the size of the structure and the scope inside it. A smaller, single-story home with light finishes sits at the fast end. A large, multi-story home with plaster, heavy finishes, phased work, or hazardous materials requiring abatement takes longer, and that timeline is scoped with your general contractor before work begins, not discovered midway.
The schedule matters beyond the gut itself, because demolition is the first trade on a renovation. Framing, mechanical, and finish crews are booked against the handoff date, and every week the gut slips pushes the entire remodeling timeline with it. You can see the sequence a professional crew works through in our interior demolition process, from walkthrough and scope to protection, removal, load-out, and the broom-swept handoff.
For investors, the same math runs through the holding costs: a gut that finishes on its quoted schedule protects the renovation start date, which protects the budget the whole project was underwritten on.
Whole-house guts are not priced as a flat per-square-foot rate the way a single room can be, because depth of scope, materials, and disposal vary too much from house to house. The useful planning figure is the per-project range: $15,000 to $35,000 for the demolition portion on an average single-family home, quoted after a walkthrough. Per-square-foot figures quoted online for gut remodels mostly describe the rebuild, not the demolition.
A 1,200 sq ft home is smaller than the average home behind the typical range, so most price toward the lower portion of the $15,000 to $35,000 band when finishes are light and no abatement is needed. Plaster, tile, or hazardous materials move it up. A written quote after a walkthrough replaces the estimate with your actual number.
A standard Precision Demolition quote includes loading, hauling, and disposal of the debris created by the confirmed scope. Additional volume beyond that scope is confirmed in writing before it is billed. Always ask whether disposal is inside any bid you compare, because leaving it out is the easiest way to make a bid look cheaper.
Testing and regulated abatement are budgeted separately from standard demolition pricing. Older Minneapolis and St. Paul homes, especially those built before 1980, can contain asbestos and lead paint, and identifying them at the quote stage keeps them out of your change orders.
The general contractor pulls the permits, and Precision Demolition operates as a licensed subcontractor under the general contractor’s permit. Homeowners running their own project should confirm their city’s requirements before work starts.
Typically 2 to 4 weeks from mobilization to handoff, set by square footage, scope, and whether abatement or phased work is involved. Your contractor should commit to the timeline in the scope before work begins, because your remodel trades are scheduled against it.
A range starts the budget. A walkthrough finishes it.
Precision Demolition serves general contractors, remodelers, restoration companies, investors, and homeowners across Minneapolis, St. Paul, Edina, Bloomington, Plymouth, Maple Grove, Eden Prairie, Minnetonka, St. Louis Park, Woodbury, Blaine, Lakeville, and Wayzata. Every crew is in-house, every project is quoted per scope in writing, and every gut is handed back clean and broom-swept, ready for the next trade.
Call 612-517-7680 for a house gut estimate in Minneapolis-St. Paul.
Phone: (612) 517-7680
Email: zubin@precisiondemolition.net
Request a Project Quote: Click Here
You can find our Better Business Bureau Profile here!
Contents
Toggle